Metrosuite
Community

Housing that fits the street it is built on.

Why small buildings

For decades most of Toronto's residential streets allowed a house and nothing more, and much of the new rental housing arrived as one- and two-bedroom units in towers. Small buildings with family-sized homes on ordinary streets are the housing the city has since said it wants, and has barely begun to build.

Metrosuite builds them one lot at a time. What that does for a street is modest and concrete, and it is set out below.

5Homes on a lot that held one house
2–3Bedrooms in most of the homes we build
40%Lower modelled energy use and emissions, by covenant, at Willowdale Avenue
4 hrsTo set the Park Street North home on its foundation

As of September 2026. Energy: CMHC MLI Select energy covenant registered on title at Willowdale Avenue, measured against the energy-code reference building. Set time: CMHA Haliburton, Kawartha, Pine Ridge, October 2024.

Who the homes are for

Family-sized, and often more than one generation.

Most of what Metrosuite builds is two- and three-bedroom: homes for families, and for the households that have a parent or grandparent under the same roof or in the garden suite at the back. That is not a product we invented — it is how a large part of the city already lives — but it is the housing that is hardest to find new, and the layouts are designed around it: separate entrances, single-level suites, and bedrooms that don't share a wall with a neighbour's.

Two residents sharing tea in the kitchen of a completed Metrosuite home
A completed Metrosuite home.

What it means for the street.

Visitors being shown through a finished garden suite at the Beresford Avenue open house
Visitors at the Beresford Avenue open house, Toronto, 2024.

Gentle density

A fourplex and a garden suite sit on the same lot as the house they replace, within the height and setbacks the zoning already allows. There is no rezoning and no tower. New families arrive on streets that already have schools, transit and parks built for them.

A factory-built module lifted over the existing house into the rear yard in Peterborough
Park Street North, Peterborough. The home was set on its foundation in about four hours.

Less disruption

Framing, insulation, wiring, plumbing and finishes happen in a factory. The street sees demolition, foundations and a crane day, then the finishing work, rather than months of framing and trades. Crane days are planned with the City and with the neighbours ahead of time.

Energy

Designed for the energy tier from the first drawing.

Every Metrosuite multiplex is modelled by an independent energy consultant and designed to CMHC MLI Select's energy tier. The financing depends on it, so it is designed in rather than applied for afterwards.

At Willowdale Avenue the commitment is a covenant registered on title: at least 40% lower energy intensity and greenhouse-gas emissions than the code reference building.

Opening of the Park Street North garden home
Opening of the Park Street North garden home, Peterborough, April 2025.

Housing for a community agency.

In October 2024 Metrosuite delivered a garden home for the Canadian Mental Health Association Haliburton, Kawartha, Pine Ridge, in the rear yard of a property the agency owns on Park Street North in Peterborough. The agency described it as the first garden home in Peterborough established by a social service agency. It is used as supportive housing.

The Park Street North project

After the keys.

Buildings that are held rather than sold are managed by Metrosuite, with one point of contact for residents and an app for maintenance requests, rent and access to the home. The people who built the building stay responsible for it.

How we manage what we hold

Contact

Have a lot on a street like this?