Design study, Drewry Avenue — the fourplex from the street. Finished renderings and photographs will follow.
Design study
Design study — the garden suite at the rear of the lot.
Product
Fourplex and garden suite, 5 rental homes
Status
Design and permitting
Metrosuite's role
Builder and construction manager
Ownership
Third-party ownership entity, affiliated with Metrosuite
Delivery method
Factory-built modules
Years
2026–2027
Acquired in August 2026 and planned as an all-three-bedroom building: four family units in the fourplex and a three-bedroom garden suite with its own basement, each home with parking.
The building permit application was filed in August 2026. The site is the most straightforward of the current group — a level lot, clear servicing and no heritage or tree constraints in the build envelope.
The architect and the manufacturer are coordinating the structural system so that the permit set and the factory set are the same drawings.
Milestones
Site acquired
August 2026
Building permit application filed
August 2026
Permit issuance
Targeted late 2026
Factory fabrication
Following permit issuance
As of October 2026. Planned dates depend on manufacturer and municipal schedules and are updated as they change.